SYS.DOC_ID: HYP-PDK-01
REV: 1.0.4
CLASS: RESTRICTED
DATE: 2024_10_24
SEQ: [ACTIVE]
FACILITY_VIEW
NODE 01 / RACK_CLST_A
Server Rack
781492 032649
ENTITY

HYPERHYTHMIC.AI

PROJECT_SCOPE

AI DATACENTER
FACILITY

LOCATION_VECTOR
JOHOR BAHRU, MALAYSIA
[SECURE ZONE]
ARCHITECTURE
NVIDIA B300 GPU
MULTI-EXAFLOP DENSE COMPUTE
STATUS: INITIATED
CONFIDENTIAL PROSPECTUS. UNAUTHORIZED DUPLICATION OR DISTRIBUTION STRICTLY PROHIBITED UNDER PROTOCOL 7A. ALL SPECIFICATIONS SUBJECT TO DEPLOYMENT TIMELINES.

THE COMPUTE GAP

SECTOR_ANALYSIS: APAC_REGION
METRIC: MEGAWATT_DEFICIT
SITUATION_REPORT
THE ASIA-PACIFIC REGION IS MASSIVELY UNDERSERVED FOR NEXT-GENERATION AI TRAINING INFRASTRUCTURE.
CURRENT DATA CENTERS LACK THE POWER DENSITY AND COOLING CAPACITY REQUIRED FOR HIGH-PARAMETER LLM TRAINING WORKLOADS.
PROJECTED_DEMAND_2025
500MW+
[REQUIRED SECURE CAPACITY FOR TIER-1 AI LABS IN REGION]
SUPPLY_DEFICIT
75%
[CRITICAL SHORTAGE OF HIGH-DENSITY, LIQUID-COOLED RACK SPACE]

HYPERCLUSTER
ARCHITECTURE

SYSTEM_SPECS: FACILITY_01
CONFIG: HIGH_DENSITY
B300_LINK
SCHEMATIC: D2C_LIQUID_LOOP
TOTAL_CAPACITY
150 MEGAWATTS
PHASED DEPLOYMENT PLAN
COMPUTE_HARDWARE
NVIDIA B300 STACK
OPTIMIZED FOR TERA-SCALE LLM TRAINING
COOLING_SYS
DIRECT-TO-CHIP LIQUID
TARGET_PUE
1.08 MAX
RACK_DENSITY
120+ KW/RACK
NETWORK_FABRIC
INFINIBAND 800G
STRATEGIC_POSITIONING

JOHOR BAHRU
MALAYSIA

1° 29' 14" N / 103° 46' 16" E
SITE_01SG_HUB
CONNECTIVITY
Direct Singapore Link
200GBPS DEDICATED DARK FIBER.
LATENCY < 2MS.
POWER_GRID
Substation Proximate
DUAL-FEED 275KV TRANSMISSION LINES. RENEWABLE ALLOCATION TBD.
SUBMARINE_CABLES
Landing Station <5KM
DIRECT ACCESS TO INTRA-ASIA AND TRANSPACIFIC BACKBONES.

INTEGRATION NETWORK

OPERATIONAL_PARTNERS
STATUS: CONFIRMED
PARTNER_01

NEYON.AI

EDGE INFERENCE DEPLOYMENT
INTEGRATION_ROLELAST-MILE MODEL SERVING & DISTRIBUTION.
TARGET_METRICINFERENCE LATENCY < 10MS ACROSS APAC HUB.
DEPLOYMENT_SCOPEREGIONAL EDGE NODE FEDERATION.
PROTOCOLDIRECT FABRIC PEERING TO HYPERCLUSTER_CORE.
SYS_INTEGRATION_PROTOCOLS: ACTIVE[ DATA_FLOW_SYNC: VERIFIED ]

CAPACITY EXPANSION

ALLOCATION_RESERVE
PHASE: PRE-DEPLOYMENT
DEPLOYMENT_TIMELINE
PHASE
MILESTONE
TARGET_DATE
STATUS
PHASE 01
SITE ACQUISITION & POWER DESIGN
Q3.2024
COMPLETE
PHASE 02
FACILITY SHELL & CORE BUILD
Q4.2024
IN_PROGRESS
PHASE 03
B300 RACK DEPLOYMENT & LIQUID LOOP
Q1.2025
PENDING
PHASE 04
NODE COMMISSIONING & LIVE TEST
Q2.2025
PENDING
RESERVE_STATUS
CAPACITY_ALLOCATED
40%

SEEKING ANCHOR TENANTS FOR REMAINING 90MW TIER. STRATEGIC VOLUME PRICING AVAILABLE FOR EXAFLOP COMMITMENTS.
CONTACT_TERMINAL
> INIT SECURE COMM_CHANNEL
> PING HQ_NODE
AUTH_SIG: EXEC_BOARD
EOF_MARKER